How we fix it
Cut off, dry, test, reconnect.
Safety comes before anything else, followed by confirmation that every part is dry and undamaged before you use it.
Cutting off wet circuits
Circuits the water has touched are isolated, so dry areas of the building can get their supply back where that is safe.
Drying and testing
We open up soaked fittings and give them time to dry. Each circuit then gets tested to confirm the insulation is intact before we switch it on again.
Repairs and paperwork
Fittings, sockets or cables that are beyond saving are replaced. If an insurance claim is in the pipeline, we can supply a written summary of our findings and the work done.

